Kids,
Within 48 hours, I will have the artwork for the PCBs in my in
basket for review. At that point it should take a day or so for
changes and then the order will be at the fabricators. The
design of the VCO board took a bit longer than we anticipated as
it turned out to be quite a little stinker to get everything on based
on my special requirements and the maximum depth
requirements of Doepfer racks. I'm told we're there though.
The faceplates have been on order for about a week. All of the
larger quantity parts (pots, knobs, jacks, switch covers,) are here
already. Things are taking ahpe nicely!
I'll let you know about more progress as it happens.
- P